← all news
Water, power, utilities · Canarias · 20.10, 06:14

CNMC: power restoration after 2025 outage was fast but protocols are missing

The Spanish regulatory body CNMC assessed the power restoration process following the 2025 outage. The report states that power restoration was fast and effective.

Prepared by AI from the sources below. We make sure it sticks to the facts in the sources, but AI can make mistakes - if in doubt, the source prevails. Automatically translated from Polish. How we make these texts →

The body simultaneously identified deficiencies in the system. These include untested protocols and poor communication during the crisis. Emergency procedures for network operators require improvement. This is necessary to avoid chaos during future sudden power cuts.

Sources
Report a mistake
canano.liveContact a humanDown on match days? → claw.taila339e8.ts.net